Default Highlights from PInnacle Conference call

LOA will be negotiated for pay rates if contract is not complete by the time we start flying
ALL pilots will be flying both the 900 and the 200 Example: DTW- to a place where the 900 is and then switch, and then so on and so forth
16 900's to be delievered
Crew base may be opened in either ATL SLC CVG depending on how delta wants us to fly them.
Pinnacle will own the planes
Pinnacle Airlines INC, will be the operator of the planes.
4th simulator coming in to do differences training, training to start in august or september.
Aircraft will be delievered at a rate of 1 or 2 per month.
Aircraft will have 76 seat config.