Thread: DAL Poolie Info
View Single Post
Old 04-04-2014 | 09:24 AM
  #1571  
like2fly2
Line Holder
 
Joined: Jan 2014
Posts: 46
Likes: 0
Default Equipment Bid

There has been plenty of discussion on pairing construction by fleet type (i.e. 717 flies lots of legs vs 737 1-2 legs per day). Can anyone comment on the QOL differences that one might see in the various equipment types. I'm thinking in terms of days off per month, pairing length, and average reserve utilization. Thanks in advance.
Reply