Originally Posted by
PilotFrog
Here in lies the problem. You DON'T HAVE to acknowledge by 0200 per the contract, only per the letter sent out by SD.
PilotFrog, here is the PWA language. I am following the contract, not SD's letter. I think this part has been beaten to death.
d. be required to check his schedule via DBMS or VRU:
10 1) after block-in of the last flight segment of his rotation prior to his release (see
11
Section 12 G. 13. – 14.), and
12 2) no later than 0200 base time on his first on-call day following a non-fly day, so as
13 to be able to acknowledge