Originally Posted by CousinEddie
If you go to the System documents tab, you will see two documents that begin with "SSC". The first one is dated the 6th which is the initial G-line prediction. The second one is dated the 11th which is the final G-line lock in for bid processing. Check the SSC 11th document sometime on the 11th or before bids close on the 12th if you are close to the G- line. It will give you the file number of the G-man that will be used
Great info. Thanks.