View Single Post
Old 05-22-2014 | 04:19 AM
  #158004  
ROBO320
Line Holder
 
Joined: Dec 2013
Posts: 62
Likes: 0
Default

A few weeks ago I sent a message to our Rotation Construction Committee regarding the continued deterioration of the ability to get adequate rest with our changing rotations. I'm sure this will come as no surprise to some but this is what we're dealing with-

"The main emphasis the company is putting on rotation construction is the reduction of credit time. This and Part 117 are producing rotations that at times are vastly different than what we had historically seen. The company is unwilling to look at any changes that it believes will increase its costs. If you feel there is a fatigue issue then you need to contact the FRMT at ALPA Safety."

Keep your backpack on- cuz u might be sleeping in the terminal😳

So, can anyone spell out to me what is rush here? Section 6 is not that far away. And I expect a a lot.

BTW, just floating this out there... What do you think Delta is buying next. Think way outside the box........