Originally Posted by
Check Essential
12.D.1
The max duty period based on report time. (9 hours report to release)
Um the LOA puts table B of FAR 117 into effect, which has 12 hour FDP, for the time of night that the CDO's would sign in, so they could do it now without having it in the contract.