View Single Post
Old 05-23-2014 | 10:29 AM
  #158323  
Sink r8
Gets Weekends Off
 
Joined: Jun 2009
Posts: 5,113
Likes: 0
Default

Originally Posted by Ferd149
T is dead on about longer trips. NWA had a 4:15 minimum day, and it's a huge driver on trip construction. Now, can someone smart explain a minimum day vs what we just agreed to. It looks real similar...
I'll take that, and embarrass myself with a wrong answer:
On a min day, each day has to be brought up to at least the min value, with credit if needed.
On an average daily guarantee, the entire trip has to be equal to the ADG * the number of days on the trip (minus carveouts).

Let's say MIN and ADG are both 5:15.
Let's the trip is blocked 2:15/6:15/4:15, or 12:45 total
With an ADG, you get 5:15 * 3 = 15:45 (because it's > 12:45)
With a MIN, you would get 5:15/6:15/5:15, or 16:45

Of course, keep in mind I have no idea *** I'm talking about, but I think that's how they work.