Originally Posted by
Bucking Bar
The first number I heard was $38m. Someone added a 1 to yours.
Some modelling was done. Again, I think these things would have gone senior. I do not know what base / equipment you are but I'd been all over these at 400.1 to 500nm of a hub.
It was 40 million when originally announced, and after the departure of the SDPs they were advertising 38 million.