Originally Posted by
iceman49
NYC 330s are the current plan, but as replacements for the 76...no timing on the replacement.
The 330 is already flying enough departures out of NYC for a base. There is no need to replace any 767 flying. The plan however is to wait for the new 330's so the base can be opened with Minimal training. The new airframes are however delayed to May/June next year for the first two and that might slip further if airbus does not get their act together.