Originally Posted by
DALMD88FO
Which would lead me to ask why the heck hasn't Carmen been building them into the longer trips before?
Because the economic penalty was not big enough to override other issues. I had a schedule volunteer also explain NY was somewhat unique because of high transport and layover costs. It also has a higher average stage length then any other base. This makes it easy to have plenty of long legs to deliver a min credit solution.