Originally Posted by
Bucking Bar
Put your post into context ... replace C2015 with C2000 and 2016 with 2001.
Things were pretty bright in 2000. Not so much by 2002. The lesson we should have learned is that you plan your scope for worst case contingencies, because it is when the worst case hits that your structures will be tested under the most stress.
Besides, if it is protection we do not need, then it should cost nothing to get, right?
I guess that is a fair response. Nothing is the operative word though. With all the hiring coming up, I'm not worried about it and I am still not willing to pay anything for it. If I'm an island, so be it.