Originally Posted by
prop1900
In regards to the possibility of 175s to piedmont, How will that fit into the current route structure with most of there legs around 30 minutes long. Is there a need for 70 seats on existing routes?
I'm not fluent on PDT route structure, but looking at the equipment and just a glance at their route map is one of the reasons I'm very skeptical about 175s at PDT. I think if one takes a very hard look at the TA when it surfaces, one will be able to discern what the plan is.