Thread: DAL Poolie Info
View Single Post
Old 10-21-2014 | 05:15 AM
  #2972  
Alan Shore's Avatar
Alan Shore
Gets Weekends Off
 
Joined: Oct 2013
Posts: 1,299
Likes: 0
Default

Originally Posted by MikeF16
I just talked to a friend who was awarded SLC in August, he won't actually transition until December or January even though he doesn't require a training event. As a new guy I didn't realize just how much time could pass between award and action, especially considering no training.
The conversion window of a vacancy bid is typically six months long. A pilot can be converted any time within that window, so long as he is converted in seniority order with other pilots holding an AE to that same category.
Reply