View Single Post
Old 10-22-2014 | 01:51 PM
  #170980  
Sink r8
Gets Weekends Off
 
Joined: Jun 2009
Posts: 5,113
Likes: 0
Default

Originally Posted by iceman49
Flight Dispatch Release Acknowledgement (FDRA) Process
The Flight Dispatch Release Acknowledgement (FDRA) process is being revised to allow crews to complete the FDRA hand-off much earlier in the departure process. This change will allow ACS personnel to focus more attention on passenger accommodations and the proper flight close-out process during a high workload time by eliminating the requirement to visit the flight deck to retrieve the FDRA. The Captain is jointly responsible with the gate agent to ensure the proper completion of the FDRA and the collection of all signatures is accomplished. The ACS agent will not close the main cabin door until receipt of the FDRA and the required verbal confirmation by the Captain is obtained. An All Pilot Bulletin defining specific procedures will be published and distributed prior to implementation.
If they don't close the door until verbal confirmation is given, how does this prevent a cockpit visit?