View Single Post
Old 10-25-2014 | 03:47 AM
  #46  
Xray678
Line Holder
 
Joined: Jan 2007
Posts: 1,341
Likes: 40
From: 765A
Default

Originally Posted by Justdoinmyjob

All that said, at Delta the PM makes changes with the AP off, as directed by the PF. PF makes changes with the AP on, or can direct the PM to make changes during high work loads (below 10K.) .
Small point, but high workload is not defined. It may be at FL200 descending into LAX, and it may be 2000 ft going into JAN.
Reply