Originally Posted by
Geardownflaps30
I wouldn't call extending contracts until 2024 an emergency stop gap measure!
I'd be more concerned that Endeavor wasn't going to take delivery of all 81 CRJ900's and these 9 came from that scope limited quantity of 81 aircraft.
70 seaters are less bad than 90 seaters with 76 seats in them though. This is interesting for sure, but way too small to base any assumptions on. Its not enough to carry RAH/BB's future failed excursion into the real world of airlines either. Not even close. Still bad business though.