Originally Posted by
JoeyMeatballs
Absolutely drives me to the point where I almost beat my kid And punch myself in the face. It is so aggravating.
The processing times are completely unacceptable. The whole thing freezes when someone puts in for floating vacation because it needs to be manually done by a scheduler. I'm also quite sure there is a networking bottleneck too because we can have long processing times outside the first day of DOT. As we know all things IT at spirit are a disaster. Flight paperwork anyone? Ad it to the contract list. Where's my next survey?