Originally Posted by
HAL39
Our FOM is controlling in terms of upgrade requirements (FOM 16-13, F). It calls for 2,500TT and 1,000 121 SIC, 135.243 PIC, or 91.1053 PIC. Doesn't say anything about converting Mil time
I though our CBA stated 2000 total with 1500 mel or 2500 with 1000 mel for upgrade minimums and the 1000 sic too.