View Single Post
Old 02-08-2015 | 07:59 AM
  #1597  
JohnnyDingus
Gets Weekends Off
 
Joined: Sep 2014
Posts: 1,244
Likes: 0
Default

Bid Package Distribution and Award 1. Timeline
a. The Round One bid package will be available not later than 1200 local time on the 10th of the month prior to the bid month.
b. Round One bidding will close at 1200 local time on the 13th of that month.

The Round One pre-award will be published no later than 1700 on the 15th of the month.
d. The Round One award will be published not later than 1700 local time on the 16th.
e. The Round One schedule adjustment period will open at 1700 local time on the 16th of the month and will close at 1700 local time on the 17th of the month.
f. Round Two bid information will be posted electronically no later than 1200 local time on the 20th day of the month.
g. Round Two bidding will close at 1200 local time on the 22nd of the month.
h. The final award will be published electronically no later than 1700 local time on the 24th of the month.


Source: PSA Contract
Reply