Originally Posted by
Systemized
I'm curious, is it an actual 4-hour min day at Piedmont? Or a 4-hour daily trip average? For example, with an actual 4-hour min day, a 2-day trip that blocks two hours on day one and six hours on day two would be worth ten hours with a 4-hour min day. With a 4-hour daily trip average, said trip would be worth eight hours with an average of 4 hours per day.
It's the latter. 4 hour average.