Originally Posted by
R57 relay
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
We have fenced and unfenced equipment. We also had different versions of the 757 which took time to integrate. If memory serves, the first jet that trained with mixed crews was the Guppy if memory serves. As for the timeframe, well I defer to others for that