Originally Posted by
R57 relay
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
Every seat/base was biddable except for 747 and 787, and the first joint bid was within a week after SLI was finalized.