Old 02-19-2015 | 01:33 AM
  #14  
BigGuns's Avatar
BigGuns
Gets Weekends Off
 
Joined: Jan 2008
Posts: 797
Likes: 0
From: 767-400
Default

Originally Posted by R57 relay
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
At Delta we had the SLI before single operating certificate(SOC). The first joint bid cameout about 2 weeks before SOC, so 1 day after SOC we started to fly/train together.
Reply