View Single Post
Old 02-20-2015 | 01:37 PM
  #1970  
scudrunner13
On Reserve
 
Joined: Sep 2014
Posts: 116
Likes: 0
Default

Hi guys,

What would be the current upgrade time in 3 months at PSA for a 121 pilot with 2500 total, 500 121 time, 1050 PIC (100 Turbine). Any word of a NYC or PHL base?
Reply