Originally Posted by
gloopy
It would if we changed the availability grid, which would be an absolute necessity. 22:45 is way, way too low for a "week of vacation". We wouldn't stand a 7 day trip that credited that. Or even a 5 day. As of now our "vacation week" is about 4 days and that needs to improve.
I can 100% agree with that.