Originally Posted by
pagey
This is not correct.
The blended rate increases will never stop. The 89 aircraft thing refers to the raise we get for every "large RJ" that is added to PSA's operating certificate. The blended rate is separate and is a ratio of 200 vs 7/9. It will continue to increase for each 7/9 we get.
If it's even possible, has anyone calculated out based on the projected delivery schedule what the final pay rates might be?