Originally Posted by
Roadkill
Backdoor B's are out.
WS question for end of month: my NOTIONAL BACKDOOR sched has a trip in early May. If I put in a WS for a carryout trip in Apr right now, it WILL conflict with the May trip--which is good; I can select "yes even if it conflicts with next month", and I should get the Apr trip and it should auto DROP the May trip right?
Question-- since scheds haven't been loaded into DBMS as "firm", is there a risk they will re-run May after I do this and I'll just get assigned a different trip? Or are these backdoor scheds essentially done, and this move will result in me dumping first trip in May?
Thx
Short answer is, No. It will either not let you white slip it until the May scheds are unlocked, and/or it will let you but drop the May trip, after the May scheds are complete, but it won't re-run anything based on your white slip today.