The LCA carve-out of trips is a horrendous concession in my mind, but it does solve some company problems with the massive OE flood that is on the way for a decade. In some ways, company problems are my problems too. What are some other ways the company can solve this problem?
If I have it right, the FAA requires 25 hours of OE but Delta's policy is 35 (with schedulers scheduling roughly 40). How about we just require the FAA mandate, and schedule no more than 30? Naturally, we leave LCA bidding as is.
Thoughts? Surely there are better ideas, but I haven't heard this discussed much.