The NC notepad is out, one line that caught my attention:
F/O OE bid process modified so that 25% of OE trips are bid. More details will be covered in a later Notepad
OR another way to say it as
F/O OE bid process modified so that 75% of OE trips are not available to bid. More details will be covered in a later Notepad