Originally Posted by
hallkdsm
Just finished basic indoc (BI). I can confirm that mock and real bids are now day 1. Found out bases when we showed up then did a mock bid. The actual bid was in the afternoon. as far as time between BI and aircraft training my class had anywhere from 3 days to 20+ days in between.
Was the wait time for class aircraft specific?