View Single Post
Old 07-03-2015 | 03:33 PM
  #881  
TurbineTime
Line Holder
 
Joined: Dec 2007
Posts: 273
Likes: 0
From: Emb 170/175 FO
Default

Originally Posted by flyguy23
They still have quite a few open articles. Unless the company backs off its final proposal, there will be no vote, period. They want a contract, but at a predetermined and unrealistic cost. Still trying to be "cheap".
Not totally accurate, all articles are currently on the table. This was shared in last weeks update. Both sides are passing final proposals back and forth at this point.
Reply