Originally Posted by
UALinIAH
I'm sure they company just did the token 30 pilot base opening bid so that they can BAT all the 76T folks over from ORD and SFO before the December deadline of the LOA.
Wasn't a token bid. They were required to do that per LOA. They won't be able to force BAT "all" 76T pilots in ORD and SFO to the 756. They can only force half of the need with involuntary BATS.