Thread: Tool of the day
View Single Post
Old 07-10-2015, 08:47 AM
  #6587  
iceman49
Gets Weekends Off
 
Joined APC: Jun 2008
Posts: 3,716
Default

Originally Posted by MikeF16 View Post
I'd like to offer a dual tool to ramp and ground @ LGA. 84 minutes from touchdown to block-in -- low traffic density, perfect weather, and 2 controllers going out of their way to intentionally delay planes and try to make the other look bad. About the only thing the two controlling agencies could work together on was blaming each other for the problem.
Are we not paid by the minute?
iceman49 is offline