Originally Posted by
PicklePausePull
Where does it say that in the TA?
page 353.
Regular lines shall be constructed with a maximum of 313 hours TAFB
in a 4-week bid period, and 390 hours TAFB in a 5-week bid period, and
470 hours TAFB in a 6-week bid period.
A single trip in a 6-week bid
period shall not exceed 390 TAFB. Regular lines will only be
constructed with a maximum of 15 work days in a 4-week bid period and,
19 work days in a 5-week bid period, and 23 work days in a 6-week bid
period.