Originally Posted by
pipe
I have worked under a PBS program. My spouse has worked under two of them.
The quality and integrity of the schedules produced is entirely dependent upon who controls the many switches and parameters within the program.
Anytime the word control is introduced into the FDX discussion, I think we know how that turns out for us.
Pipe
But our current VTO system is 100% controlled by management.