Originally Posted by
BlaneO
Where can I find how much spillover time there is in a carryout rotation? The trip is not in the original bid package, and I can't find the breakout in icrew.
Originally Posted by
Jughead135
Easiest place is if the trip is in Open Time--it'll break it out for you on the summary page.
Only other way I've found is to do the math--take the time from the day(s) in the current month, subtract from the trip's total. Remember, all credit paid on the last day (i.e., in the carryout month), except your DPM (2:00), if applicable, pays on the specific day(s) in question.
PS: Also, once the
next month's bid package comes out, the carryout trips are listed there for anything changed or added, at the very end of the bid packet (it will say "REPLACES # XXXX" for a changed rotation, or "REPLACES # NEW" for an added one). Still doesn't give you the breakout like the list at the top of the bid pack, though....