Originally Posted by
Schwanker
PCS processes the requests in the following order:
- MLOA
- APD
- PD
- recovery slip
- white slip
- swap with pot
Question: Can you put in a PD and a WS to be run on the same PCS? If so, would this basically equate to a swap with greater odds the trip still being there picking it up as a WS (ie...not going to someone junior waiting for the swaps to be run)?
You just cracked the code!
If the trips have overlapping footprints...I also put a lower priority WS in for the trip I just dropped... to protect me in case the trip I really wanted was gone for some reason.