Originally Posted by
busdriver12
I wonder what stops them now from doing that? Unless they deleted language that limited the number of VTO's, not sure what would be different after the TA than before it, at least as far as stopping them from making more VTO's. In fact, what stops them from making 100% of the bid pack secondary lines, now or after the TA.
I ask because I'm too tired to look all this up, and someone here probably knows this off the top of their head.
Well, for one, if all the lines were "secondary" they wouldn't be secondary would they?
I think it has something to do with:
25.B. Bid Period Package
2. The bid period package shall list the following line bidding choices:
a. Regular lines;
b. Secondary lines; and
c. Reserve lines.
and this
25.D.2. Secondary Line Construction
a. A sufficient number of secondary lines shall be published to cover trips anticipated to be dropped from regular lines and other open time that may be available.
And also what Raptor said.