Thread: Skywest
View Single Post
Old 11-19-2015 | 11:54 AM
  #14327  
Westernflight
Gets Weekends Off
 
Joined: Apr 2015
Posts: 104
Likes: 0
Default

Originally Posted by N1234
There are two aspects to globalization - at least the way I understand it.

......

Aggregate "Satisfaction" - PBS also tries to achieve a global optimum in terms of line satisfaction. Not sure that is the offical term but that's probably the best way to describe it.

Let's assume a simple example with only two lines.

Line 1 (senior) has only pairings from layer 1.
Line 2 (junior) has only pairings left from layers 6 and 7

Let's assume that you switch out one or two pairings from line 1 and and instead of assigning layer 1 pairings assign two layer 4 pairings. And let's furrher assume that this will give enough flexibility to get Line 2 to come up wioth a solution of say layer 2, 3 and 4 pairings instaed of 6 and 7 only.

Then this solution would be preferred by PBS becaus the aggregate satisfaction for lines 1 and 2 is considered higher.

Basically, senior line gets scr ... a little bit but junior line benefits disproportioanlly more than senior got scr ...

The issue is that there is nothing you can really do about it w/o dis-abling "globalization"
Well that explains my line exactly, based on my reason report, I had a complete line from my layer one for the first time ever... But gave me a pairing from layer 5 and from layer 7 instead, pulling away some high credit locals I had a right to and left some big holes in my schedule. Globalization needs to die a cold fast death. I wonder if the Anonymous group could help? Still not sure how I was given a 6 day work block when I bid "work block size" 1-5 in all layers. Feels like CC pi$$ed on my face and stole my cookies.