Originally Posted by
Schwanker
We gave productivity concessions in the POS failed TA? I must have dozed off during that part of the dALPA roadshow.

Just going from memory I can think of two productivity changes with the failed TA - feel free to add if I am omitting anything.
1. Increasing the TALV by 1 hr.
2. Pulling 75% of potential IOE trips from the bid package prior to FO bidding.
I would say these both fall into the category of productivity.
Scoop