PCS "anomaly": I tried swapping a 5-day for a 3-day and a 2-day over the exact same days. PCS wouldn't allow it due to Reserve Required being equal to Reserve Available.
I didn't think PCS would prevent this swap but it did. When I talked to Scheduling, they said the PCS software isn't really smart enough to see what I was trying to do and saw it as a drop -- which I couldn't due because of Reserve levels. And Scheduling isn't able to manually override PCS even though what I was trying made perfect sense to the scheduler.
PCS is what it is, but does anyone else have experience with not being able to swap in a similar case?