Originally Posted by
Omar 111
Holiday period is 2 days before and 1 day after Christmas. I would call 800-USA-ALPA tomorrow and talk to one of the scheduling guys. The company needs to be held accountable on crap like this scheduler not being able to explain why your swap didn't go through.
Omar
Okay...I talked to the ALPA scheduling bubba and he figured it out, and it was a bonehead error on my part.
When I put the swap in, I listed the trips to add vertically instead of horizontally. With a vertical listing, PCS sees the request as an "either or" which, in this case, was a net drop. I needed to list the trips next to each other which translates to adding both instead of just one.
Hopefully that reminder can save someone some angst.