I've had a 4-day trip converted to a 3-day trip due to an equipment substitution. My iCrew schedule shows "RR" in the left margin (I assume that means reroute).
If nothing else is assigned, will I be pay protected for the day that was removed from my schedule?
The PWA examples all deal with same-day reroutes. I couldn't find anything pertaining to an entire day being dropped. Thanks for the help.