Originally Posted by
ConnectionPilot
With the current fleet projection and lack of flow at Compass, the upgrades are drastically slowing down. SkyWest is at a 3.5 year upgrade and only to get quicker with the current fleet projection. That doesn't mean it won't slow like Compass though if we start to lose the 30 CRJ 700s coming off contract.
We're not loosing the 30 and we aren't at a 3.5 year upgrade either. Last awards were still at 4 years.