Originally Posted by
Packrat
I saw an IFL crew in CA once. The engineer and F/O were unloading the main cabin and the Capt. was unloading the belly by hand. Didn't look like they had the 'option' on that one.
Paid by the mile; the quicker you get stuff done, the quicker you get back home. You could sit around the FBO complaining that the loaders are incompetent, or you could man up and make things happen.
The fact that the Captain was unloading the belly while the engineer was up top should speak wonders - in a positive sense. Amazing crews, no egos involved, everyone has the same goal.