Originally Posted by
CLT Guy
They won't. They will need to raise pay. That was my point.
PSA will be forced to raise pay, or they will not be able to attract any new hires.
It's too late. We already aren't attracting new hires. The stuff has only begun to hit the fan. Even if we get a flood of new hires, they are months away from the line barring no delays. We have been shrinking while taking on more aircraft. According to all the surveys everyone came here for the fast upgrade. No one came for the bases, flow or FO pay. At 4 a month, the upgrade flood is over. Righting the ship today will still mean no noticeable results for months. PSA was gambling on buying someone or someone going bankrupt. They gambled and lost. Time to pay.