Originally Posted by
CLT Guy
PSA's flow for April will have 2004 hires flowing. By August, it should be up to 2006 hires flowing and 2008 hires by this time next year. These estimates are based on current rates of flow, and not with the increased flow as the total number of captains on property increases.
So, right now, we are at 11 years on property to a flow at PSA.
That will be close to Piedmont. By the end of these year mostly all 2007 hires will be gone.