March class canceled. 40 people swimming in the pool. Will continue interviewing at a slow pace. Atlas plans to drag things out contract wise as long as possible (like 18+ months). 737 air frames are still being sourced with no new news. The other two 777's from LAN are in limbo with this merger. The people working on the latest LAN bird have been reassigned other tasks in the office.