Originally Posted by
motorboatin
Respectfully as possible, you and the other dude that you were agreeing with are smoking crack!!! The long term business plan at F9 is better than any other carrier in the nation?? Really!!? Come on now guys, drink the Kool Aid because tastes good. I love the mathematical speculations. Very creative and entertaining...however they unfortunately lack any verifiable facts.
Kool Aid? I never touch the stuff. Crack on the otherhand...
But if you take a second look at
my 1st post about upgrades, you'll see that I postulate that the 2 year upgrade is already over, and those hired today will have a much longer wait. I also outlined my reasons for saying such.
However, reference "the other guy" for the sake of discussion, if the fleet actually did nearly triple in 5 years as he theorizes, then he would be correct. The upgrade would hover between 2.5 to 3 years. It's very simple math actually. The main variable is the growth.
As far as verifiable facts, your post provides even less than ours did, but thanks for playing