Ok, I need some education on reserve bidding. I must have May 5,6,7,8 off. The April bid period includes May 1. Minimum days on call for my category is 4 days.
If I bid May 1 off in the April bid period, can I bid May 5,6,7,8 off in the May bid period even though there is only a 3 day on call period (May 2,3,4)? Or do I have to have 1 may on call to have that four day on call period. The other side of that is can I have one day on call at the end of April (May 1) or will that be denied because it violates the 4 day min on call period? Hence do I end up with 7 days in a row on call (last 4 of April bid period and first 3 of May bid period)?
Thanks for any help!
Denny